The gross crest length is based on the number of spans. The total length of the spillway is calculated by multiplying the number of spans by the length of each span. For example, for 5 spans each of 12.5 meters, the total length is 5 × 12.5 m = 62.5 m .
For a structured design report or spreadsheet implementation, the following references are highly recommended: Ogee Spillway Design Calculations | PDF - Scribd ogee spillway designxls better
The defining characteristic of an Ogee spillway is its precise profile. Designing it manually requires solving complex equations for the upstream quadrant and the downstream curve, which is based on a power law. A superior design tool automates the calculation of the x and y coordinates for the upstream and downstream profiles. It uses standard ogee formulas to generate a point-by-point description of the crest shape, which can then be exported directly to CAD software for drafting the final structure. The gross crest length is based on the number of spans
The design begins with the standard weir discharge equation to determine the required effective length ( Lecap L sub e ) or the design head ( Hdcap H sub d It uses standard ogee formulas to generate a
Calculating these coordinates at 0.1-meter intervals over a 50-meter drop involves hundreds of repetitive calculations. Why an "Ogee Spillway Design XLS" Spreadsheet is Better
Q=CLeHe3/2cap Q equals cap C cap L sub e cap H sub e raised to the 3 / 2 power : Discharge coefficient, typically around for ogee crests at design head. Lecap L sub e : Effective length, adjusted for contractions from piers ( Kpcap K sub p ) and abutments ( Kacap K sub a